Site Utilities

Water, sewer, and storm drainage — trenched, bedded, and installed to spec so your site is ready for inspection and tie-in.

Underground utilities installed to spec, ready for inspection

Water, sewer, and storm drainage have to go in right the first time — buried mistakes are expensive to fix. Ram Civil trenches, beds, and installs site utilities to spec, coordinated with your engineer's plans and ready for local inspection and tie-in to municipal systems.

What's included

  • Water line installation and tie-ins
  • Sanitary sewer installation
  • Storm drainage systems and structures
  • Trenching, bedding, and backfill to spec
  • Coordination with municipal inspectors for tie-in and approval

When you need this

  • New development requiring water, sewer, or storm infrastructure
  • Utility relocation ahead of construction
  • Drainage problems on an existing site
  • Utility work as part of a larger turnkey site package

How it works

We work from approved utility plans, trench and bed each line to the specified depth and material, and coordinate directly with municipal inspectors so tie-ins go smoothly. Everything is installed with an eye toward passing inspection the first time, not the third.